PBC Reach the Beach Training Ride: Boones Ferry Donald -Portland Bicycling Club

PBC Reach the Beach Training Ride: Boones Ferry Donald

Description

Second of the west side Reach the Beach training series rides.

Leaves from Tualatin Community Park, the start of the popular Tuesday Night west side series.

Elevation gain of 1349 feet, with maximum elevation of 429 feet and a maximum 6.4% gradient. Included is the crossing of the Willamette River on the shoulder
of Interstate 5.

No planned refreshment stop along the route, so bring some additional fuel sources.

Snow or ice cancels, check the online calendar, or call me if in doubt.

Details

Date: Sunday February 23rd, 2020
Departure Time: 10:00 am
Type: Non-Group
Pace: Brisk (15-17 mph)
Distance: 39 miles
Terrain: C
Maps: PBC Reach the Beach Training Ride: Boones Ferry Donald GPS, PBC Reach the Beach Training Ride: Boones Ferry Donald PDF

Start Location

8515 SW Tualatin Rd, Tualatin, OR 97062, USA Google Maps

Back to Rides